Walls. Not Much Else.
Eventually, the contractor removed the toilet and bathtub. The toilet relocated to the garage (nothing like getting in and out of the car next to your toilet for a month). The tub suffered from orange spots in the bottom - places where the glaze had become too thin. So we sent it away for re-glazing.
In the shower, plumbing, then valves, then floor tile (not really tile but small, grey pebbles in an epoxy grout), then dry wall appeared.
And there it all sat for a week or so. Finally, a gentle nudge ("Hey, so...this was a 2-week job and we're entering week 4. Any thoughts?" I did not make this call. I was grouchy.) brought a flurry of activity.
More on that next time.